Waterline Material Planner

Powered by Powerflex
Dashboard
STEP 1 OF 5
Project Setup

β›²
Place Your Water Source
Tap the map to place a well or tie-in. This is the starting point for your water line.
Wells / Tie-Ins0
πŸ“
Draw Water Lines
Draw the main line from your well. Use the Tee tool to split the line. Add branches for secondary runs. Tap "Add Watering Point" when lines are complete.
Main line
Branch line
Line tee (split)
Main line0 ft
Branch line0 ft
Elbows detected0
πŸ’§
Add Watering Points
Tap along your lines to place watering point markers β€” both mid-line and at line ends.
Watering Points0
Review & Edit
All drawing tools are available. Make any corrections, then calculate materials.
Open Powerflex Cart
Project Overview

ItemQtySKU
Well #1 β€” PVC Connection
What size PVC pipe is coming from the well pump?
Save Project
Project will be saved to the dashboard and can be reloaded, edited, and emailed.

Load Project
Select a previously saved project to resume editing.